What Regulation B says about getting a copy of the appraisal
Every paragraph of 12 C.F.R. §1002.14, all forty units of the official interpretation printed under it, the Bureau’s model of the notice it requires, and three passages of the Bureau’s compliance aid, on how the days are counted and on what kind of document that is — each quoted with the date it was read. The explanation between the quotes is ours. General information, not legal advice.
Published September 9, 2026
Three days before closing, a buyer asks their agent for the second time when they will actually see the appraisal. A processor mentions that the buyer signed something at application and the report will be handed over at the table. An appraisal comes in under the contract price and the buyer wants the document itself, not a number relayed on the phone, before deciding what to do about an appraisal contingency. A file dies at underwriting, and the buyer — who paid for the appraisal — asks whether they still get it.
There is a federal rule, and it is short. It is 12 C.F.R. §1002.14, one section of Regulation B, and it runs to two paragraphs: paragraph (a), which is five numbered paragraphs, and paragraph (b), which is a chapeau and three definitions. All nine of those units are quoted on this page.
A rule this short survives being summarised badly, which is why three things about it are commonly reported the other way round. Its thirty-day deadline is written as a conditional. Its notice paragraph and its copy paragraph describe what changes hands in different words. And the phrase carrying its deadlines is not among the three words it stops to define. None of that has to be taken on trust here: the whole of §1002.14 is printed below, so each one can be looked up in the text rather than believed.
Three more documents are quoted with it, because the section alone does not answer the questions people arrive with. The Bureau publishes an official interpretation of §1002.14 in Supplement I to part 1002, and all forty units of it are quoted here — that is where “provide” turns out to mean “deliver”, where mailing acquires a three-business-day assumption of its own, where a waiver becomes effective, and where a broker price opinion appears on a list of valuations. Form C-9 in Appendix C is the Bureau’s model of the notice, quoted with the three units of interpretation printed under it. And for the unit every deadline here is counted in — the business day, which the regulation and its interpretation both use and neither defines — three passages of a Bureau compliance aid are quoted in section 5, labelled as the dated document it is.
1. Who owes the copy, and which applications the rule speaks to
Paragraph (a)(1) is quoted below exactly as eCFR prints it. It is the anchor of the section: three later paragraphs refer back to it by name, and the two definitions that matter most are written for it.
The duty is addressed to "a creditor". The sentence names no other party — not an appraiser, not an appraisal management company, not a settlement agent, and nobody on the real estate side of the file. On its own words the copy runs from the creditor to the applicant, which is also what tells a reader which desk the document is coming off.
The trigger is an application for credit "that is to be secured by a first lien on a dwelling", and both halves of that phrase do work. The lien has to be a first lien on the face of the words. "Dwelling" is one of the three terms the section defines for itself, in paragraph (b)(2), and that definition is quoted in section 12. It reaches wider than the everyday sense of the word, which is what makes this trigger wider than it first reads.
What has to be provided is stated as "all appraisals and other written valuations developed in connection with an application". "Valuation" is another of the three terms the section defines for itself, in paragraph (b)(3), and that definition is quoted in section 12. How far the phrase and the definition reach in a particular file is not something this page resolves.
One thing the sentence does not do is distinguish a purchase from any other kind of credit. It speaks of "an application for credit" secured by a first lien on a dwelling and stops there.
The Bureau’s official interpretation of the section settles four things the sentence leaves quiet, and all four are quoted below rather than described. The section covers those applications whether the credit is for a business purpose or a consumer purpose, with an example of each. On a renewal it applies where the creditor develops a NEW appraisal or other written valuation, and does not apply to the extent the creditor uses ones previously developed. “Written” reaches paper, electronic media such as CD or email, and any other similar media. And where there is more than one applicant the notice and the copies need only go to one — but to the primary applicant where one is readily apparent, and the same is true of who may give a waiver.
What the rule and its official interpretation say
“A creditor shall provide an applicant a copy of all appraisals and other written valuations developed in connection with an application for credit that is to be secured by a first lien on a dwelling. A creditor shall provide a copy of each such appraisal or other written valuation promptly upon completion, or three business days prior to consummation of the transaction (for closed-end credit) or account opening (for open-end credit), whichever is earlier. An applicant may waive the timing requirement in this paragraph (a)(1) and agree to receive any copy at or before consummation or account opening, except where otherwise prohibited by law. Any such waiver must be obtained at least three business days prior to consummation or account opening, unless the waiver pertains solely to the applicant's receipt of a copy of an appraisal or other written valuation that contains only clerical changes from a previous version of the appraisal or other written valuation provided to the applicant three or more business days prior to consummation or account opening. If the applicant provides a waiver and the transaction is not consummated or the account is not opened, the creditor must provide these copies no later than 30 days after the creditor determines consummation will not occur or the account will not be opened.”
— 12 C.F.R. §1002.14(a)(1), www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
“Section 1002.14 covers applications for credit to be secured by a first lien on a dwelling, as that term is defined in § 1002.14(b)(2), whether the credit is for a business purpose (for example, a loan to start a business) or a consumer purpose (for example, a loan to purchase a home).”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-1, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Section 1002.14(a)(1) applies when an applicant requests the renewal of an existing extension of credit and the creditor develops a new appraisal or other written valuation. Section 1002.14(a)(1) does not apply to the extent a creditor uses the appraisals and other written valuations that were previously developed in connection with the prior extension of credit to evaluate the renewal request.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-2, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“For purposes of § 1002.14, an “appraisal or other written valuation” includes, without limitation, an appraisal or other valuation received or developed by the creditor in paper form (hard copy); electronically, such as CD or email; or by any other similar media. See § 1002.14(a)(5) regarding the provision of copies of appraisals and other written valuations to applicants via electronic means.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-3, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“If there is more than one applicant, the written disclosure about written appraisals, and the copies of appraisals and other written valuations, need only be given to one applicant. However, these materials must be given to the primary applicant where one is readily apparent. Similarly, if there is more than one applicant for credit in the transaction, one applicant may provide a waiver under § 1002.14(a)(1), but it must be the primary applicant where one is readily apparent.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)-1, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
The trigger, read in four parts
- Who owes it“A creditor shall provide…”. The sentence names a creditor and no other party — not an appraiser, not an appraisal management company, not anyone on the real estate side of the file
- Which application“…an application for credit that is to be secured by a first lien on a dwelling”. “Dwelling” is defined for this paragraph at §1002.14(b)(2); “first lien” is not defined in the section
- What has to be provided“a copy of all appraisals and other written valuations developed in connection with” that application. “Valuation” is defined for this paragraph at §1002.14(b)(3)
- Where the sentence is silentIt does not distinguish a purchase from any other credit, and it does not define “promptly” or “business day”. Other law may speak where this paragraph does not
2. When the copy is due, and the waiver that moves it
The second sentence of the paragraph quoted above sets the timing, and it sets it as a pair rather than as a single deadline. A copy is due "promptly upon completion", or "three business days prior to consummation of the transaction (for closed-end credit) or account opening (for open-end credit)", whichever is earlier. The two limbs are not alternatives a party picks between; the sentence resolves them with "whichever is earlier".
The third and fourth sentences are the waiver, and their structure is the part summaries lose. An applicant may waive "the timing requirement in this paragraph (a)(1)" and agree to receive any copy "at or before consummation or account opening" — so on the face of the text the waiver moves WHEN the copy arrives, and the sentence still describes a copy arriving. The waiver is also qualified twice over: it operates "except where otherwise prohibited by law", and it "must be obtained at least three business days prior to consummation or account opening".
That second qualifier has its own carve-out, and it is narrow. The three-business-day requirement for obtaining the waiver does not apply where the waiver "pertains solely to" a copy of a valuation "that contains only clerical changes from a previous version" — and the earlier version has to have been one provided to the applicant three or more business days before consummation or account opening. Both limbs of that carve-out are in the printed text; neither is a general exception for late-arriving documents.
The last sentence is the thirty-day tail. It reads "If the applicant provides a waiver and the transaction is not consummated or the account is not opened, the creditor must provide these copies no later than 30 days after…". As printed, the thirty days is conditioned on a waiver having been given. Restated without that opening clause it becomes a flat thirty-day rule for any file that does not close, which is not what the sentence says. The words above are the check.
Two limbs, resolved by “whichever is earlier”
- Promptly upon completionThe first limb. “Promptly” is not defined anywhere in the section
- Three business days prior to consummation, or to account openingThe second limb — consummation for closed-end credit, account opening for open-end credit. The sentence resolves the pair with “whichever is earlier”
- A waiver moves that timingAn applicant may waive “the timing requirement in this paragraph (a)(1)” and agree to receive any copy “at or before consummation or account opening, except where otherwise prohibited by law”
- The waiver has a deadline of its ownIt “must be obtained at least three business days prior to consummation or account opening”, unless it pertains solely to a copy containing only clerical changes from a version provided three or more business days prior
- If a waiver was given and the deal does not happen“no later than 30 days after the creditor determines consummation will not occur or the account will not be opened”. As printed, this sentence opens with a condition
3. What “provide” turns out to mean, and when a document is “complete”
The two deadlines in the sentence above are the whole of what the regulation says about timing. Almost everything a reader needs in order to apply them is in a different document: the Bureau publishes an official interpretation of this section in Supplement I to part 1002, and comment 14(a)(1)-4 with its five subparagraphs is quoted below in full.
The first subparagraph is the one most often missed, and it moves a closing date. For purposes of the timing requirement, “provide” means “deliver” — and delivery occurs three business days after mailing or delivering the copies to the applicant’s last-known address, or when evidence indicates actual receipt, whichever is earlier. A mailed copy therefore carries a three-business-day assumption of its own, sitting on top of the three-business-day deadline, unless there is evidence it arrived sooner.
The third subparagraph settles when the clock can start at all. “Completion” occurs when the last version is received by the creditor, or when the creditor has reviewed and accepted the appraisal or other written valuation including any changes or corrections required, whichever is later. The second subparagraph says the “promptly upon completion” standard depends on the facts and circumstances, and names two of them: when the creditor receives the document, and the extent of any review or revision afterwards.
The last two handle the files that go wrong. Where a valuation has been developed but is not yet complete as consummation approaches, the three-business-day deadline still applies unless it was waived. And where the transaction will not be consummated at all, the copy still goes out promptly upon completion — or, where the deadline was waived, no later than 30 days after the creditor determines the deal will not happen, which is the sentence section 2 reads as conditional.
One more comment belongs with these, and it concerns a file with several drafts in it. For purposes of paragraph (a)(1) the word “all” does not refer to every version of the same appraisal: the latest version received is what is required, with the addition that a revision received after a copy has already been provided is itself provided too.
What the official interpretation says
“Section 1002.14(a)(1) requires that the creditor “provide” copies of appraisals and other written valuations to the applicant “promptly upon completion,” or no later than three business days before consummation (for closed-end credit) or account opening (for open-end credit), whichever is earlier.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-4, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“For purposes of this timing requirement, “provide” means “deliver.” Delivery occurs three business days after mailing or delivering the copies to the last-known address of the applicant, or when evidence indicates actual receipt by the applicant, whichever is earlier. Delivery to or actual receipt by the applicant by electronic means must comply with the E-Sign Act, as provided for in § 1002.14(a)(5).”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-4.i, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“The application and meaning of the “promptly upon completion” standard depends upon the facts and circumstances, including but not limited to when the creditor receives the appraisal or other written valuation, and the extent of any review or revision after the creditor receives it.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-4.ii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
““Completion” occurs when the last version is received by the creditor, or when the creditor has reviewed and accepted the appraisal or other written valuation to include any changes or corrections required, whichever is later. See also comment 14(a)(1)-7.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-4.iii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“In a transaction that is being consummated (for closed-end credit) or in which the account is being opened (for open-end credit), if an appraisal or other written valuation has been developed but is not yet complete, the deadline for providing a copy of three business days before consummation or account opening still applies, unless the applicant waived that deadline as provided under § 1002.14(a)(1), in which case the copy must be provided at or before consummation or account opening.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-4.iv, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Even if the transaction will not be consummated (for closed-end credit) or the account will not be opened (for open-end credit), the copy must be provided “promptly upon completion” as provided for in § 1002.14(a)(1), unless the applicant has waived that deadline as provided under § 1002.14(a)(1), in which case as provided for in § 1002.14(a)(1) the copy must be provided to the applicant no later than 30 days after the creditor determines the transaction will not be consummated or the account will not be opened.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-4.v, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“For purposes of § 1002.14(a)(1), the reference to “all” appraisals and other written valuations does not refer to all versions of the same appraisal or other valuation. If a creditor has received multiple versions of an appraisal or other written valuation, the creditor is required to provide only a copy of the latest version received. If, however, a creditor already has provided a copy of one version of an appraisal or other written valuation to an applicant, and the creditor later receives a revision of that appraisal or other written valuation, then the creditor also must provide the applicant with a copy of the revision to comply with § 1002.14(a)(1). If a creditor receives only one version of an appraisal or other valuation that is developed in connection with the applicant's application, then that version must be provided to the applicant to comply with § 1002.14(a)(1). See also comment 14(a)(1)-4 above.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-7, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“promptly upon completion”
A standard, not a count. Comment 14(a)(1)-4.ii says it depends on the facts and circumstances; 14(a)(1)-4.iii says when “completion” occurs
three business days before consummation
Or account opening, for open-end credit. The point it counts back from is defined in paragraph (b)(1)
the paragraph chooses between them with the words “whichever is earlier”
And “provide” means “deliver”
Comment 14(a)(1)-4.i: delivery occurs three business days after mailing or delivering to the last-known address, or when evidence indicates actual receipt, whichever is earlier
4. “Promptly upon completion”, in the Bureau’s own five examples
Because that standard turns on facts and circumstances, the Bureau published five worked examples of it — three describing conduct that satisfies the standard and two describing conduct that does not. All five are quoted below in full, in the order the commentary prints them. eCFR sets a descriptive catchline in italics ahead of each, and this page does not quote catchlines, so the quotes begin at “On day 15” and its equivalents rather than at the line describing them.
The instructive one is the last, because it concerns a file with two valuations in it: a completed automated valuation model report held back for thirty days while a deficient appraisal went for review, then sent alongside the revised appraisal. The commentary’s conclusion is that the appraisal was provided promptly and the AVM report was not. Each document in a file carries its own clock, and one waiting on another is what breaks it.
Reading the five together, what moves between them is the gap between completion and sending, and whether the applicant actually received the copy more than three business days before consummation. What none of them supplies is a number of days that is always enough — the standard the examples illustrate is still the standard the paragraph states.
What the official interpretation says
“Examples in which the “promptly upon completion” standard would be satisfied include, but are not limited to, those in subparagraphs i, ii, and iii below. Examples in which the “promptly upon completion” standard would not be satisfied include, but are not limited to, those in subparagraphs iv and v below.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-5, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“On day 15 after receipt of the application, the creditor's underwriting department reviews an appraisal and determines it is acceptable. One week later, the creditor sends a copy of the appraisal to the applicant. The applicant actually receives the copy more than three business days before the date of consummation (or account opening). The creditor has provided the copy of the appraisal promptly upon completion.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-5.i, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“An appraisal is being revised, and the creditor does not receive the revised appraisal until day 45 after the application, when the creditor immediately determines the revised appraisal is acceptable. A week later, the creditor sends a copy of the revised appraisal to the applicant, and does not send a copy of the initial appraisal to the applicant. The applicant actually receives the copy of the revised appraisal three business days before the date of consummation (or account opening). The creditor has provided the appraisal copy promptly upon completion.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-5.ii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“The creditor receives an automated valuation model (AVM) report on day 5 after receipt of the application and treats the AVM report as complete when it is received. On day 12 after receipt of the application, the creditor sends the applicant a copy of the valuation. The applicant actually receives the valuation more than three business days before the date of consummation (or account opening). The creditor has provided the copy of the AVM report promptly upon completion.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-5.iii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“On day 12 after receipt of the application, the creditor's underwriting department reviews an appraisal and determines it is acceptable. Although the creditor has determined the appraisal is complete, the creditor waits to provide a copy to the applicant until day 42, when the creditor schedules the consummation (or account opening) to occur on day 50. The creditor has not provided the copy of the appraisal promptly upon completion.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-5.iv, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“The creditor receives an AVM report on day 5 after application and completes its review of the AVM report the day it is received. The creditor also has ordered an appraisal, but the initial version of the appraisal received by the creditor is found to be deficient and is sent for review. The creditor waits 30 days to provide a copy of the completed AVM report, until the appraisal is completed on day 35. The creditor then provides the applicant with copies of the AVM report and the revised appraisal. While the appraisal report was provided promptly upon completion, the AVM report was not.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-5.v, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
Examples the Bureau says satisfy the standard
- An appraisal reviewed and found acceptable, then sent about a week later and actually received more than three business days before consummation
- A revised appraisal sent about a week after the creditor received and accepted it, with no copy of the earlier version sent
- An automated valuation model report treated as complete on receipt and sent about a week after that
Examples the Bureau says do not satisfy it
- An appraisal determined complete, then held for weeks until the consummation date was scheduled
- A completed valuation held back while a second, deficient one went for review, then sent alongside it
What moves between them is the gap between completion and sending, and whether the applicant actually received the copy more than three business days before consummation. Each document in a file carries its own clock — that is the whole of the fifth example.
5. How the days are counted, and the definition the rule does not supply
Four counts in this section run on the same unit. Three business days before consummation for the copies. The third business day after an application for the notice in section 7. At least three business days before consummation for a waiver. And three business days after mailing, inside what delivery means. The phrase appears throughout the section and its official interpretation and is defined in neither.
The Bureau addressed that in a compliance aid, and three passages of it are quoted below. The one describing the document itself comes first, because what kind of document this is governs how much weight the rest carries. It is a Compliance Aid, it carries a version and a date on every page — Version 1.2, 25 February 2021 — and unlike the regulation and its official interpretation it is a dated publication rather than continuously-updated text. What is quoted here is what the Bureau published on that date.
On the term itself the factsheet does three things. It states that the Rule does not provide a definition of “business days” for purposes of providing copies. It points loans covered by what it calls the HPML Appraisal Rule at a different Bureau guide, named there and quoted nowhere here. And for other loans it addresses a creditor applying its own reasonable definition, which it says may include counting Saturdays, offering the alternative definition in Regulation Z §1026.2(a)(6) as an example — a provision named in that sentence and quoted nowhere on this page.
The consequence for anyone counting backwards from a closing date is the opposite of what a search result usually implies. The count is not fixed by the section quoted on this page. Two files at two lenders can land on two different dates without either count contradicting the text printed here, and whether a Saturday sits inside a particular three-day span is a question about that creditor and that loan.
What the sources say
“This is a Compliance Aid issued by the CFPB. The Bureau published a Policy Statement on Compliance Aids, available at https://www.consumerfinance.gov/policy-compliance/rulemaking/final-rules/policy-statement-compliance-aids/, that explains the Bureau’s approach to Compliance Aids.”
— CFPB factsheet v1.2, p.1 note, files.consumerfinance.gov/f/documents/cfpb_ecoa-valuation_delivery-of-appraisals-factsheet.pdf, read September 9, 2026
“The Rule does not provide a definition of “business days” for purposes of providing copies of appraisals and other written valuations. For loans covered by the HPML Appraisal Rule, consult the Bureau’s Small Entity Compliance Guide: TILA Higher-Priced Mortgage Loans Appraisal Rule. For other loans, you can apply your own reasonable definition, which may include counting Saturdays – as provided, for example, in the alternative definition in Regulation Z, § 1026.2(a)(6).”
— CFPB factsheet v1.2, p.2, files.consumerfinance.gov/f/documents/cfpb_ecoa-valuation_delivery-of-appraisals-factsheet.pdf, read September 9, 2026
“If an appraisal is to be delivered by mail, then it must be delivered no later than three business days before consummation of the transaction. 12 CFR § 1002.14(a)(1). For example, assume the appraisal is placed in the mail on Monday, December 2. Absent evidence of actual receipt by the applicant, delivery is deemed to have occurred on Thursday, December 5 ( i.e., three business days after mailing the appraisal). As a result, the earliest date that consummation may occur is Tuesday, December 10 (i.e., three business days after delivery).”
— CFPB factsheet v1.2, p.3, Method 1, files.consumerfinance.gov/f/documents/cfpb_ecoa-valuation_delivery-of-appraisals-factsheet.pdf, read September 9, 2026
The unit every deadline is counted in
- Four counts run on itThree business days before consummation for the copies, the third business day after an application for the notice, and at least three business days before consummation for a waiver — all in §1002.14 — plus three business days after mailing, which is in the official interpretation of what delivery means
- Defined in none of themThe term is used in the paragraphs and comments quoted on this page and no quotation above supplies a meaning for it
- What the Bureau published about thatA compliance aid — dated and versioned — three passages of which are quoted on this page. It states that the Rule does not provide a definition for this purpose, points HPML-covered loans at a different guide, and addresses a creditor applying its own reasonable definition, which it says may include counting Saturdays
- What follows for a closing dateThe count is not fixed by the section quoted here. Two files at two lenders can land on two different dates without either count contradicting this text
6. The waiver, and the two situations the interpretation says it works in
One thing first, because the phrase “appraisal waiver” is used in the market for more than one thing. What paragraph (a)(1) lets an applicant waive is the timing requirement — when the copy arrives. That is a different thing from any arrangement under which no appraisal is ordered at all, whatever such an arrangement is called on a rate sheet; this page is about the sentences quoted in section 2 and says nothing about any other.
The commentary sets out the two situations in which a waiver is effective, and both are quoted below. The first is an affirmative oral or written statement given no later than three business days before consummation or account opening. The second is the narrow clerical-changes route, and the comment supplies the test the regulation does not: revisions count as clerical only if they have no impact on the estimated value and no impact on the calculation or methodology used to derive the estimate. The comment adds that on this second route the applicant still receives the copy of the revision at or prior to consummation.
The qualifier that governs both is not in either limb. It is in the two sentences introducing them, each of which carries it once — the first about what paragraph (a)(1) permits, the second about when a waiver is effective — so it reaches both routes without appearing in either. Which law it points at, in which state, on which kind of transaction, is not a question this page answers.
What the official interpretation says
“Section 1002.14(a)(1) permits the applicant to waive the timing requirement if the creditor provides the copies at or before consummation or account opening, except where otherwise prohibited by law. Except where otherwise prohibited by law, an applicant's waiver is effective under § 1002.14(a)(1) in either of the following two situations:”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-6, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“If, no later than three business days prior to consummation or account opening, the applicant provides the creditor an affirmative oral or written statement waiving the timing requirement under this rule; or”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-6.i, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“If, within three business days of consummation or account opening, the applicant provides the creditor an affirmative oral or written statement waiving the timing requirement under this rule and the waiver pertains solely to the applicant's receipt of a copy of an appraisal or other written valuation that contains only clerical changes from a previous version of the appraisal or other written valuation provided to the applicant three or more business days prior to consummation or account opening. For purpose of this second type of waiver, revisions will only be considered to be clerical in nature if they have no impact on the estimated value, and have no impact on the calculation or methodology used to derive the estimate. In addition, under § 1002.14(a)(1) the applicant still must receive the copy of the revision at or prior to consummation or account opening.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(1)-6.ii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
Route one, in comment 14(a)(1)-6.i
An affirmative oral or written statement waiving the timing requirement, given no later than three business days prior to consummation or account opening
Route two, in comment 14(a)(1)-6.ii
Within three business days, but only where the waiver pertains solely to a copy carrying only clerical changes — revisions with no impact on the estimated value and none on the calculation or methodology
What the paragraph says a waiver moves
When the copy arrives — to “at or before consummation or account opening”. And where the transaction does not close after a waiver, the copies come no later than 30 days after the creditor determines it will not
7. The notice at application, and a wording difference worth seeing
Before any copy is owed, paragraph (a)(2) puts a written notice on the clock. A creditor is to mail or deliver a notice in writing of the applicant's right to receive a copy, "not later than the third business day after the creditor receives an application for credit that is to be secured by a first lien on a dwelling".
The paragraph then covers the case where the file changes shape. If the credit is not to be secured by a first lien on a dwelling at the time of application and the creditor later determines that it will be, the same notice goes out not later than the third business day after that determination. So the trigger is not only the arrival of an application; it is also the moment a determination is made.
There is a wording difference between this paragraph and the one quoted in section 1, and it is visible with both on the page. Paragraph (a)(1) requires a copy of "all appraisals and other written valuations". Paragraph (a)(2) describes a notice of the right to receive a copy of "all written appraisals". The phrases are not the same phrase. What the difference does — whether it narrows anything, and if so what — is not resolved on this page, and no official interpretation is quoted here. It is flagged because a reader comparing a notice against a copy obligation meets both phrases and is better off having seen them together.
What the rule and its official interpretation say
“For applications subject to paragraph (a)(1) of this section, a creditor shall mail or deliver to an applicant, not later than the third business day after the creditor receives an application for credit that is to be secured by a first lien on a dwelling, a notice in writing of the applicant's right to receive a copy of all written appraisals developed in connection with the application. In the case of an application for credit that is not to be secured by a first lien on a dwelling at the time of application, if the creditor later determines the credit will be secured by a first lien on a dwelling, the creditor shall mail or deliver the same notice in writing not later than the third business day after the creditor determines that the loan is to be secured by a first lien on a dwelling.”
— 12 C.F.R. §1002.14(a)(2), www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
“Nothing in the text of the disclosure required by § 1002.14(a)(2) should be construed to affect, modify, limit, or supersede the operation of any legal, regulatory, or other requirements or standards relating to independence in the conduct of appraisers or the use of applicant-ordered appraisals by creditors.”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(2)-1, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
The notice runs from whichever event applies
- Not later than the third business day after the creditor receives the applicationWhere the application is already one for credit to be secured by a first lien on a dwelling
- Not later than the third business day after the creditor determinesWhere the credit was not to be secured by a first lien on a dwelling at the time of application and the creditor later determines that it will be
- Two phrases, printed differently(a)(1) requires a copy of “all appraisals and other written valuations”. (a)(2) describes a notice of the right to receive a copy of “all written appraisals”. What the difference does is not resolved on this page
8. The Bureau’s model of that notice, and what a creditor may add to it
The paragraph above says a notice goes out and says what it is a notice of. What it looks like is in a different part of the regulation: Form C-9 in Appendix C is the Bureau’s sample disclosure of the right to receive a copy of appraisals, and it is the closest thing on this page to the document a buyer actually receives. eCFR prints three paragraphs under that heading and all three are quoted below, the third being a bracketed line, reproduced as printed.
Two things in the model are worth reading against the paragraph it models. It says a copy of any appraisal will be given promptly “even if your loan does not close” — the outcome paragraph (a)(4) addresses in section 10. And it addresses paying for an additional appraisal for the applicant’s own use at their own cost, which is a different thing from the reimbursement the charging paragraph permits.
Supplement I carries an interpretation of the form as well, in three units, all quoted. It addresses creditors designing their own form, adding to it, or modifying it to reflect their own policies and procedures, and then gives two examples of additions: a telephone number for leaving the address a copy should be sent to, and a notice of the cost the applicant will be required to pay the creditor for the appraisal or other valuation. That second example is where the notice paragraph and the charging paragraph meet.
What the rule and its official interpretation say
“We may order an appraisal to determine the property's value and charge you for this appraisal. We will promptly give you a copy of any appraisal, even if your loan does not close.”
— 12 CFR pt. 1002, App. C, Form C-9, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“You can pay for an additional appraisal for your own use at your own cost.”
— 12 CFR pt. 1002, App. C, Form C-9, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“[In your letter, give us the following information:]”
— 12 CFR pt. 1002, App. C, Form C-9, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“If not otherwise provided under other applicable disclosure requirements, creditors may design their own form, add to, or modify the model form to reflect their individual policies and procedures. For example, a creditor may want to add:”
— 12 CFR pt. 1002, Supp. I, App. C comment 1, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“A telephone number that applicants may call to leave their name and the address to which a copy of the appraisal or other written valuation should be sent.”
— 12 CFR pt. 1002, Supp. I, App. C comment 1.i, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“A notice of the cost the applicant will be required to pay the creditor for the appraisal or other valuation.”
— 12 CFR pt. 1002, Supp. I, App. C comment 1.ii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
9. What the copy costs, and what the valuation may cost
Paragraph (a)(3) separates two charges that get run together in conversation, and the separation is the whole of the paragraph.
The first is the charge for providing the copy. A creditor "shall not charge an applicant for providing a copy of appraisals and other written valuations as required under this section". The prohibition is written about the act of providing the copy, and it is tied to what the section requires.
The second is the cost of the valuation itself. The paragraph says a creditor "may require applicants to pay a reasonable fee to reimburse the creditor for the cost of the appraisal or other written valuation" — and then qualifies it, "unless otherwise provided by law".
The official interpretation adds two things the sentence does not, and both are quoted below. It names what falls on the copy side — photocopy, postage or other costs incurred in providing the copy. And it addresses the reimbursement side at more length: a reasonable fee is not prohibited so long as it is not increased to cover the cost of providing copies; a creditor’s cost may include an administration fee charged by an appraisal management company; the paragraph does not, however, legally obligate the applicant to pay such fees; and one example is given of a fee prohibited by other law, a second appraisal required under two provisions named there and quoted nowhere on this page.
Two things the paragraph does not do are visible while the text is in front of the reader. It does not set an amount, a cap, or a method for arriving at one; the word carrying that work is "reasonable". And the closing qualifier points outward, at law not quoted on this page.
What the rule and its official interpretation say
“A creditor shall not charge an applicant for providing a copy of appraisals and other written valuations as required under this section, but may require applicants to pay a reasonable fee to reimburse the creditor for the cost of the appraisal or other written valuation unless otherwise provided by law.”
— 12 C.F.R. §1002.14(a)(3), www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
“Creditors may not charge for photocopy, postage, or other costs incurred in providing a copy of an appraisal or other written valuation in accordance with section 14(a)(1).”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(3)-1, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Section 1002.14(a)(3) does not prohibit a creditor from imposing a reasonable fee to reimburse the creditor's costs of the appraisal or other written valuation, so long as the fee is not increased to cover the costs of providing copies of such appraisals or other written valuations under § 1002.14(a)(1). A creditor's cost may include an administration fee charged to the creditor by an appraisal management company as defined in 12 U.S.C. 3350(11). Section 1002.14(a)(3) does not, however, legally obligate the applicant to pay such fees. Further, creditors may not impose fees for reimbursement of the costs of an appraisal or other valuation where otherwise prohibited by law. For instance, a creditor may not charge a consumer a fee for the performance of a second appraisal if the second appraisal is required under 15 U.S.C. 1639h(b)(2) and 12 CFR 1026.35(c).”
— 12 CFR pt. 1002, Supp. I, comment 14(a)(3)-2, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
What the paragraph says may not be charged for
“providing a copy of appraisals and other written valuations as required under this section”. The prohibition is written about the act of providing the copy, and it is tied to what the section requires.
What the paragraph says may be charged for
“a reasonable fee to reimburse the creditor for the cost of the appraisal or other written valuation” — and the sentence then closes “unless otherwise provided by law”, pointing outward at law not quoted on this page.
10. Files that are denied, withdrawn or left incomplete
Paragraph (a)(4) is one sentence and it does one job: it stops the outcome of the application from switching the requirement off. The requirements set out in paragraph (a)(1) apply "whether credit is extended or denied or if the application is incomplete or withdrawn".
Read alongside the paragraph quoted in section 1, that produces the distinction the shorthand collapses. Paragraph (a)(4) makes (a)(1) apply to a file that never closes. It does not itself set a deadline for that file. One sentence in the section is written for a transaction that does not happen — the last sentence of (a)(1) — and it opens "If the applicant provides a waiver".
So the section, on its printed words, carries a thirty-day sentence conditioned on a waiver and a paragraph (a)(4) that is not conditioned on anything. Both are quoted on this page. How they operate together in a particular file is a question about that file, and about authorities this page does not quote.
What the regulation says
“The requirements set forth in paragraph (a)(1) of this section apply whether credit is extended or denied or if the application is incomplete or withdrawn.”
— 12 C.F.R. §1002.14(a)(4), www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
What survives the file not closing, and what is conditioned
- §1002.14(a)(4) — carries no conditionThe requirements set forth in (a)(1) apply “whether credit is extended or denied or if the application is incomplete or withdrawn”. It makes (a)(1) apply; it sets no deadline of its own
- §1002.14(a)(1), last sentence — opens with a condition“If the applicant provides a waiver and the transaction is not consummated or the account is not opened…”, then 30 days from the creditor’s determination. This is the section’s one deadline written for a transaction that does not happen
11. Delivering the copies electronically
Paragraph (a)(5) permits electronic delivery and attaches a condition to it. The copies required by §1002.14(a)(1) "may be provided to the applicant in electronic form, subject to compliance with the consumer consent and other applicable provisions of the Electronic Signatures in Global and National Commerce Act".
The paragraph is a pointer as much as a permission. It does not restate what those provisions require; it names the federal Act and cites it, and the requirements stay where that Act puts them. This corpus's article on electronic signatures quotes that Act directly, including the consumer-consent provisions paragraph (a)(5) names, and it is linked at the foot of this page.
What the paragraph reaches is also specific. It speaks about the copies required by paragraph (a)(1). The notice in paragraph (a)(2) is described in its own paragraph as one a creditor is to "mail or deliver", and paragraph (a)(5) does not mention it.
What the regulation says
“The copies required by § 1002.14(a)(1) may be provided to the applicant in electronic form, subject to compliance with the consumer consent and other applicable provisions of the Electronic Signatures in Global and National Commerce Act (E-Sign Act) (15 U.S.C. 7001 et seq.).”
— 12 C.F.R. §1002.14(a)(5), www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
A permission, a condition, and a pointer
- What it permitsThe copies required by §1002.14(a)(1) “may be provided to the applicant in electronic form”
- The condition it attaches“subject to compliance with the consumer consent and other applicable provisions” of the Act it then names and cites
- What it does not restateThe paragraph names the federal Act and cites it. What that Act requires stays where the Act puts it; none of it is quoted on this page
- What it does not mentionThe notice in (a)(2), which its own paragraph describes as one a creditor is to “mail or deliver”. Paragraph (a)(5) speaks about the copies required by (a)(1)
12. The three words the section defines, and the ones it leaves open
Paragraph (b) supplies meanings, and it says at the outset how far they reach: "For purposes of paragraph (a) of this section". The three definitions below are written for the paragraph quoted through this page and are not offered as general definitions of anything.
"Consummation" is the time that a consumer becomes contractually obligated on a closed-end credit transaction. It sits directly against the timing sentence in section 2, whose three-business-day limb runs to consummation for closed-end credit and to account opening for open-end credit — and this definition speaks to the closed-end half.
"Dwelling" is the term that sets the section's reach, and it is wider than the word usually is: a residential structure containing one to four units, whether or not that structure is attached to real property, and the definition then adds that the term includes, but is not limited to, an individual condominium or cooperative unit and a mobile or other manufactured home.
Three comments sit under the first two definitions and all three are quoted below. On “consummation” the Bureau says the thing a reader on a purchase file most needs to hear: when a contractual obligation is created is determined under applicable law, and §1002.14 does not make that determination. A nonrefundable fee does not by itself produce consummation, and becoming contractually committed to a SALE transaction is not consummation unless the consumer also becomes legally obligated to accept a particular credit arrangement — which is the line between signing the contract and closing the loan. On “dwelling” the single comment carves out motor vehicles as another statute defines them.
"Valuation" is the widest of the three. It is "any estimate of the value of a dwelling developed in connection with an application for credit". The load is carried by "any estimate" and by "developed in connection with an application for credit"; the definition is not written around a particular document, a particular author, or a particular format.
What the section does not define matters as much, and because paragraph (b) is printed here in full it can be checked rather than believed. "Business day" is not among the three, and it is the unit the section's deadlines are counted in. Neither is "promptly", which is one limb of the timing sentence. Neither is "first lien", "appraisal", "creditor", "applicant" or "application". Regulation B has other sections, at §1002.2 and elsewhere; this page quotes §1002.14 only.
What the rule and its official interpretation say
“For purposes of paragraph (a) of this section:”
— 12 C.F.R. §1002.14(b), www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
“The term “consummation” means the time that a consumer becomes contractually obligated on a closed-end credit transaction.”
— 12 C.F.R. §1002.14(b)(1), www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
“When a contractual obligation on the consumer's part is created is a matter to be determined under applicable law; § 1002.14 does not make this determination. A contractual commitment agreement, for example, that under applicable law binds the consumer to the credit terms would be consummation. Consummation, however, does not occur merely because the consumer has made some financial investment in the transaction (for example, by paying a nonrefundable fee) unless, of course, applicable law holds otherwise.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(1)-1, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Consummation does not occur when the consumer becomes contractually committed to a sale transaction, unless the consumer also becomes legally obligated to accept a particular credit arrangement.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(1)-2, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“The term “dwelling” means a residential structure that contains one to four units whether or not that structure is attached to real property. The term includes, but is not limited to, an individual condominium or cooperative unit, and a mobile or other manufactured home.”
— 12 C.F.R. §1002.14(b)(2), www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
“The requirements of § 1002.14 do not apply to “motor vehicles” as defined by 12 U.S.C. 5519(f)(1).”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(2)-1, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“The term “valuation” means any estimate of the value of a dwelling developed in connection with an application for credit.”
— 12 C.F.R. §1002.14(b)(3), www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
Defined for paragraph (a) by paragraph (b)
- consummation (§1002.14(b)(1))
- dwelling (§1002.14(b)(2))
- valuation (§1002.14(b)(3))
Used by the section, not defined in it
- business day
- promptly
- first lien
- appraisal
- creditor
- applicant
- application
13. Which documents count as a valuation, and which do not
The definition quoted above is a description rather than a list of document types, and nothing in it turns on who prepared the document or what it is called. The Bureau supplied lists anyway — five examples of documents that are valuations and six of documents that are not — and all fourteen units are quoted below rather than summarised here.
One item on the first list is worth stopping on, because an agent may have produced it personally. A broker price opinion prepared by a real estate broker, agent or sales person to estimate the property’s value is on the Bureau’s list of examples of valuations. On a file where the credit is to be secured by a first lien on a dwelling, that is a document answering the definition — with everything the section says about copies, timing and charging attaching to it in the creditor’s hands rather than in the writer’s.
One item on the second list is worth the same attention for the opposite reason. An appraisal review that does not include the appraiser’s estimate or opinion of value is on the list of documents that are not valuations, and the qualifier is the whole of it: a review that does carry an estimate is not what that example describes. The same shape appears two items earlier — an inspection report is outside the term only if it neither provides an estimate of value nor is used to develop one.
Two features of the drafting keep either list from being a test. Both open with “include but are not limited to”, so neither is closed. And the exclusion list is introduced by a sentence saying that not all documents which discuss or restate a valuation constitute a valuation — so the question stays the one the definition asks. One further line is quoted with them: the term includes any attachments and exhibits that are an integrated part of the valuation.
What the official interpretation says
“Examples of valuations include but are not limited to:”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-1, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“A report prepared by an appraiser (whether or not licensed or certified) including the appraiser's estimate of the property's value or opinion of value.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-1.i, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“A document prepared by the creditor's staff that assigns value to the property.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-1.ii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“A report approved by a government-sponsored enterprise for describing to the applicant the estimate of the property's value developed pursuant to the proprietary methodology or mechanism of the government-sponsored enterprise.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-1.iii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“A report generated by use of an automated valuation model to estimate the property's value.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-1.iv, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“A broker price opinion prepared by a real estate broker, agent, or sales person to estimate the property's value.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-1.v, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“The term “valuation” includes any attachments and exhibits that are an integrated part of the valuation.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-2, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Not all documents that discuss or restate a valuation of an applicant's property constitute a “valuation” for purposes of § 1002.14(b)(3). Examples of documents that discuss the valuation of the applicant's property or may reflect its value but nonetheless are not “valuations” include but are not limited to:”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-3, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Internal documents that merely restate the estimated value of the dwelling contained in an appraisal or written valuation being provided to the applicant.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-3.i, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Governmental agency statements of appraised value that are publically available.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-3.ii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Publicly-available lists of valuations (such as published sales prices or mortgage amounts, tax assessments, and retail price ranges).”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-3.iii, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Manufacturers' invoices for manufactured homes.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-3.iv, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Reports reflecting property inspections that do not provide an estimate of the value of the property and are not used to develop an estimate of the value of the property.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-3.v, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
“Appraisal reviews that do not include the appraiser's estimate of the property's value or opinion of value.”
— 12 CFR pt. 1002, Supp. I, comment 14(b)(3)-3.vi, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
On the Bureau’s list of examples of valuations
- a report by an appraiser, licensed or not, carrying the estimate or opinion of value
- a document prepared by the creditor’s staff that assigns value to the property
- a report approved by a government-sponsored enterprise for describing to the applicant the estimate developed under the enterprise’s own methodology or mechanism
- a report generated by an automated valuation model to estimate the property’s value
- a broker price opinion prepared by a real estate broker, agent or sales person to estimate the property’s value
On the Bureau’s list of documents that are not valuations
- internal documents that merely restate an estimated value from a valuation already being provided
- publicly available governmental statements of appraised value
- publicly available lists — published sales prices, mortgage amounts, tax assessments, retail price ranges
- manufacturers’ invoices for manufactured homes
- inspection reports that neither provide an estimate of value nor are used to develop one
- appraisal reviews that do not include the appraiser’s estimate or opinion of value
Where the questions at the top meet the words
The four situations at the top of this page are not answered here. What each one meets in the text is, so that a reader starts where the words are rather than where a search result left them. All four meet one description before anything else, because it qualifies the whole of paragraph (a): an application for credit that is to be secured by a first lien on a dwelling, with "dwelling" carrying the meaning paragraph (b)(2) gives it.
The buyer asking three days out, and the processor describing something signed at application, are both asking about the same four sentences of (a)(1) — the two limbs resolved by "whichever is earlier", what a waiver moves, and the requirement that a waiver be obtained at least three business days prior with its clerical-changes carve-out. The buyer who wants the document before deciding about a contingency is asking about "all appraisals and other written valuations" and the breadth of (b)(3), though the contingency itself is a contract question this page says nothing about. And the buyer whose file died is asking about (a)(4) and about the last sentence of (a)(1), which opens with a condition; section 10 reads the two against each other.
Checking the quotes, and what they do not cover
This page makes one completeness claim, it is narrow, and it is meant to be counted. Section 1002.14 has two paragraphs. All five numbered paragraphs of paragraph (a) are quoted above — (a)(1) in section 1, (a)(2) in section 7, (a)(3) in section 9, (a)(4) in section 10 and (a)(5) in section 11. Paragraph (b) is quoted as its chapeau together with all three of its numbered definitions, in section 12. Nine quotations, and the section is complete on the page. That is what makes the negative observations here checkable rather than asserted: that the thirty-day sentence opens with a condition, and that (a)(1) and (a)(2) describe what is handed over in different words.
Three companion documents are quoted with it and each is complete in the same sense. Under “Section 1002.14—Rules on Providing Appraisals and Valuations” in Supplement I, the Bureau prints seventeen numbered comments and twenty-three roman-numeral subparagraphs beneath them — forty units, every one of them quoted above. Form C-9 is quoted in the three paragraphs eCFR prints under its heading, with the three units of Supplement I’s interpretation of that form beside it. And three passages of a Bureau compliance aid are quoted in section 5. Fifty-eight quotations in all.
How they are quoted matters as much, and two conventions apply to every one. The paragraph designator is not quoted: eCFR prints “(3) Reimbursement. A creditor shall not charge…”, so the quote begins at “A creditor” and the citation carries the “(a)(3)”. Nor is the italic catchline the publisher sets ahead of the text — “Reimbursement.”, “Multiple applicants.”, and the long descriptive catchlines on the five worked examples, which is why those five begin at “On day 15” rather than at the line describing them. Inside the designator and the catchline each quote runs from the paragraph’s first word to its last, unedited. One further piece of the publisher’s apparatus is left out: the source note at the foot of the section, “[78 FR 7248, Jan. 31, 2013]”, which records where the text came from rather than forming part of it.
What is not on this page is named rather than described. 15 U.S.C. §1691(e) appears as a locator only, and nothing here says what it provides. So does the rest of part 1002 — its other sections, the other official interpretations in Supplement I, its appendices, and the nine other sample forms Appendix C carries besides Form C-9. So do the authorities the Bureau names inside quotations printed above: 12 U.S.C. 3350(11), 15 U.S.C. 1639h(b)(2), 12 CFR 1026.35(c), 12 U.S.C. 5519(f)(1), the E-Sign Act, Regulation Z §1026.2(a)(6), the guide the compliance aid points HPML-covered loans at, and the Bureau’s Policy Statement on Compliance Aids, which the factsheet names with its URL. So does the body of appraiser-independence law that comment 14(a)(2)-1 says the required disclosure’s text does not disturb. No judicial opinion is quoted or described anywhere on this page.
The documents behind them are not all the same kind, and the source list below says which is which. The fifty-five C.F.R. quotations — the section, the forty units of interpretation printed under it, Form C-9 and the three units of interpretation of that form — go to eCFR, which serves the regulation as it currently stands and prints an “as of” date for the title; that date is beside each entry, and every quote also carries the date it was loaded. A numbered annual edition of the C.F.R. is a frozen snapshot, so re-reading one returns the same words forever even after the rule has changed; that is not what is cited here. The remaining entry is a compliance aid — a dated, versioned publication rather than continuously-updated text — and its version is printed beside it in place of an “as of” date.
What the page cannot do is apply any of it. Whether a notice went out inside three business days, whether a signature at application answers the description of a waiver, whether a particular document is a “valuation”, and how a particular creditor counts its business days are decided on facts and on authorities this page does not quote. Real Deal Pro, Inc. is a software company — not a real estate brokerage, not a mortgage lender, not an appraiser, not an appraisal management company and not a law firm. For an actual file, ask a lawyer who practises in this area, and for anything touching a licence, ask your broker and the commission in your state.
Named on this page, quoted nowhere on it
- 15 U.S.C. §1691(e)A locator only. Not one word of it is quoted, and nothing on this page says what it provides or how it bears on the regulation
- The rest of Regulation BIts other sections, at §1002.2 and elsewhere, and the official interpretations of them. This page quotes §1002.14, the forty units of interpretation printed under it, Form C-9 and the three units of interpretation of that form — nothing else
- The rest of Appendix CNine other sample notification forms sit beside Form C-9. None is quoted here and nothing is said about what any of them contains
- Regulation Z, and the guide for HPML-covered loansBoth are named inside a quotation printed above, because the Bureau named them. Neither is quoted on this page and neither is described
- State law, and case lawA quoted comment says when a contractual obligation is created is determined under applicable law. What any state provides is not stated here, and no judicial opinion is quoted or described
Try it before you decide
The Free plan is a live product tier, not a countdown: up to 3 active deals and 100 clients, with contract generation and e-signatures included. No credit card.
Free plan · No credit card required · Upgrade anytime · Set up in 5 minutes
Wrapping up
Section 1002.14 puts the duty on a creditor, keyed to an application for credit to be secured by a first lien on a dwelling, and what it requires is a copy of all appraisals and other written valuations developed in connection with that application. The timing is a pair resolved by "whichever is earlier": promptly upon completion, or three business days prior to consummation for closed-end credit or account opening for open-end credit. An applicant may waive that timing, except where otherwise prohibited by law — and the waiver itself has to be obtained at least three business days prior, subject to one narrow carve-out for a version carrying only clerical changes. A separate notice of the right to receive a copy runs on its own third-business-day clock in (a)(2).
Two words the section leans on it does not define, and the documents quoted alongside it treat them differently. "Promptly" is given a standard rather than a count in the official interpretation, illustrated there by five worked examples. "Business day" — the unit every deadline is counted in — is not defined at all, and the Bureau said so itself in the compliance aid quoted in section 5, which addresses a creditor applying its own reasonable definition and says that may include counting Saturdays. The Bureau’s own worked example of the arithmetic is quoted with it.
The interpretation is also where the practical edges are: that “provide” means “deliver”, with mailing treated as delivery three business days later unless evidence shows earlier receipt; that “completion” is the later of the last version received and the creditor’s acceptance of it; that a waiver works in two situations and not otherwise; and that a broker price opinion is on the Bureau’s list of examples of valuations. Whether any of it was satisfied in a particular file is decided on facts, on authorities this page does not quote, and sometimes on state law — one of the quoted comments says so directly.
Sources
Every quotation above is taken from the documents below, on the date shown; the explanation around each quote is ours. Statutes are amended and uniform acts are revised — check the current text before relying on any of it.
- 12 CFR §1002.14 — Rules on providing appraisals and other valuations (eCFR, current as of September 4, 2026) — Office of the Federal Register and the U.S. Government Publishing Office, www.ecfr.gov/current/title-12/chapter-X/part-1002/subpart-A/section-1002.14, read September 9, 2026
- 12 CFR pt. 1002, Supplement I — Official Interpretations (eCFR, current as of September 4, 2026) — Office of the Federal Register and the U.S. Government Publishing Office, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026
- CFPB — Factsheet: Delivery of appraisals, VERSION 1.2 (02/25/2021) — Consumer Financial Protection Bureau, files.consumerfinance.gov/f/documents/cfpb_ecoa-valuation_delivery-of-appraisals-factsheet.pdf, read September 9, 2026
- 12 CFR pt. 1002, Appendix C — Sample Notification Forms (eCFR, current as of September 4, 2026) — Office of the Federal Register and the U.S. Government Publishing Office, www.ecfr.gov/current/title-12/chapter-X/part-1002, read September 9, 2026